Templates · Submittal

Free construction submittal template

One submittal, tracked from the sub to the reviewer to the answer that is binding. Download the Excel or PDF version below, no email required.

Free construction submittal template with reviewer routing and disposition fields, Excel and PDF

What goes into a construction submittal

A submittal is documentation you send for review before it's built, most often product data, shop drawings, or samples confirming what will be installed matches the contract documents. Some submittals are scheduled deliverables instead, a 30%, 60%, or 90% design submission due on dates set by the contract, rather than something triggered by procurement. Either way, it's tracked the same way, on the same log, with the same routing.

What makes review fast: the right spec section referenced up front, the submittal type set correctly (shop drawings get a coordination review, certificates get a compliance check), and both dates that matter, when the review needs to come back to hold the schedule, and when the material actually needs to be on site.

The part people get wrong is routing. A submittal often needs a general contractor check for completeness before it goes to the design team, and if more than one discipline has to review it, architectural and structural, say, every one of them has to respond, and the strictest answer is the one that governs, not the first one back. And once it returns, the marked-up set is what you are contractually building to, not the original submission.

Runs live in Formis

This exact form runs live in Formis, and the routing runs itself. Submittal type sets what the review actually checks. If you name a GC reviewer, it goes there first for completeness, then forwards automatically. Every design reviewer you add has to respond, and the most severe disposition wins, no one has to track that by hand. And if this is not quite how your team runs submittals, change it. Add a step, rename a field, adjust the routing, it is yours to configure, no consultant, no ticket. See how the workflow actually works.

The construction submittal template running live in Formis with reviewer routing and dispositions
Also grab the submittal log template below to track every submittal's status at a glance, or see it live as a real-time register in Formis.

Prefer a log view? Download the submittal log template.

What is a construction submittal?

A submittal is documentation, product data, shop drawings, samples, or certificates, that a contractor sends to the design team to confirm what will be built or installed matches the contract documents, before it is ordered or built.

Who has to approve a submittal?

The design professional of record, architect or engineer, makes the binding decision. On many projects a general contractor reviewer checks it first for coordination and completeness before it reaches the design team.

What does approved as noted mean?

It means the submittal is approved with markups or corrections attached, and those markups become part of what you are contractually required to build to, not just a suggestion.

Get started

See it running your kind of job⁠

Set up your first project in the time it takes to find that submittal you're looking for.

14-day free trial. No setup call, no implementation fee, no consultants.